Some students can complete an assignment in 12 days. How many days will be taken by two times the number of such students for 1/3rd of this assignment ?
A)
6 days
B)
4 days
C)
3 days
D)
2 days
D
Let ‘a’ students can do the assignment in 12 days and let the required number of days be ‘b’.